Customization: | Available |
---|---|
After-sales Service: | Available |
Warranty: | 1 Year |
Suppliers with verified business licenses
Shacman 4x2 8cbm Asphalt Distributor Truck: The chassis adopts shacman F3000 4x2 chassis. The tires used are 11.00r20 18pr. The overall vehicle size is 8400*2530*3250mm, with a wheelbase of 4500mm.
The engine is B210 33, with a horsepower of 210 and a displacement of 5.9L.
Upper-mounted device: Asphalt tank and asphalt spraying system.
The tank volume is 8.45cbm. The overall tank size is 4500x2400x1650mm.The outer layer thickness of the tank is 1mm stainless steel thickness. The insulation layer thickness of the tank is 120mm. The internal thickness is 5mm carbon steel. The protective material is Q235b carbon steel and is connected by welding. Optional tank appearance and step ladder style. Optional curved mudguards. The side protection material is Q235 and is connected by welding. The rear protection is replaced by a special device. The lower edge is 480mm from the ground.
Vehicle Description | Brand | CLW |
GVW(kg) | 16000 | |
Curb Weight(kg) | 8200 | |
Loading Weight(kg) | 7605 | |
Overall Dimension(mm) | 8600*2530*3250 | |
Wheelbase(mm) | 4500 | |
Axle Load(kg) | 5600/10400 | |
Top Speed(km/h) | 89 | |
Chassis Brand | Shacman | |
Chassis Model | SX3165DR442 | |
Cabin | Single,LHD,with A/C | |
Engine | Model | B210 33 |
HP | 210 | |
Emission Standard | Euro 3 | |
Displacement/Output(ml/kw) | 5900/155 | |
Fuel Type | Diesel | |
Rate Speed(rpm) | 2500 | |
Maximum Torque(N·m) | 700 | |
Maximum Torque Speed(rpm) | 1500 | |
Gearbox | 8Forward/2Reverse Gear | |
Tyre | 11.00R20 18PR | |
Tank Description | Tank Material | Q235B,According to Customer needs |
Tank Volume(m³) | 8.45cbm | |
Outer Layer Thickness(mm) | 1 | |
Insulation Layer Thickness(mm) | 120 | |
Internal Carbon Steel Thickness(mm) | 5 | |
Oil Pressure Pump | CBQ500-L | |
Heater Brand | Riello Diesel Burner | |
Heating Method | Heat Conduction | |
Asphalt Pump Motor | 05-110-B031 | |
Asphalt Pump Flow(L/min) | 680 | |
Nozzle Number | 36 | |
Spreading Width(m) | 4.5 | |
Amount of Asphalt Spread(L/m²) | 0.25-3 |
Matters to note when using device:
When the asphalt distributor truck finishes an operation or changes the construction site,the asphalt pump and pipeline must be cleaned thoroughly;other it cannot operate next time.
Before spraying,the asphalt distributor truck must check whether the valve position is correct.When adding hot asphalt to the asphalt tank,the working temperature must reach 160-180°C.
For long-distance transportation or long working hours,the heating device can be used for heat presevation,but it cannot be used as a furnase.Avoid asphalt overflow.
When heating the asphalt in the tank with a burner,the asphalt height must exceed the upper plane of the combustion chamber;otherwise,the combustion chamber will be burned.
If the asphalt pump and pipeline are blocked by solidified asphalt,do not force the pump to rotate.User can use a blowtorch for baking,but avoid directly baking the ball valve and rubber parts.
At the begginning of spraying asphalt,user must start slowly at the begginning,and the car must maintain low-speed driving.Do not step on the accelerator pedal to avoid damaging components such as the clutch and asphalt pump.
After the end of daily operations,if there is remaining asphalt,it must be put back into the asphalt pool;otherwise,it will not solidify in the tank and cannot be operated next time.If there is a malfunction in the car or working device and it is determined that it cannot be repaired in a short time,all the asphalt in the tank must be drained.
1)Bysea (ro-ro,bulk ship or container),We will choose economical, safe andreliable transportation methods forcustomers
1.Our Advantages: